Total Acreage 356
Number of Facilities 91
Total Square Footage 7,362,074 GSF
Average Age of Facilities 27.1 Years
Student Housing Capacity 2,861 Beds
Parking Spaces 12.100
Facility List View/Download Facility List
Campus Map View/Download Campus Map
Campus Master Plan Map View/Download Master Plan Map

Sustainability and Energy Conservation Measures and Projects

Photovoltaic GenerationEnergy Generation Capacity
Parking Lot B2 467 kW
Parking Lot E6 225 kW
Student Recreation Center (SRC) 90 kW
Boeing PV Site 61 kW
Total On-Site Solar Energy Generation 843 kW
Fuel CellEnergy Generation Capacity
 Molten Carbonate Fuel Cell 1 megawatt
Active Energy Conservation Project 
Jacaranda Roof PV Project 60 kW Photovoltaic Array
Walkway LED Replacement Projects 75 fixtures will be retrofitted with LED light fixtures
Cleary Walk Walkway LED installation
Redwood Hall South West Walkway LED installation
Plummer Street South Walk Walkway LED installation
Central Plant Retro-Commissioning Energy monitoring and commission of the Central Plant
Central Plant Meter and Sensor Installation Meter installation at Central Plant buildings
LEED BuildingsRating
Completed 
Valley Performing Arts Center LEED Gold
USU Student Recreation Center LEED Gold
Under Construction
Student Housing Phase II LEED Gold
Extended Learning LEED Gold
Completed Water Conservation Measures 
Plummer Street Landscape Plummer Street Landscape - Replaced with drought tolerant landscaping
Etiwanda Street Landscape Etiwanda Street Landscape - Replaced with drought tolerant landscaping
USU Rec Field – Artificial Turf Field USU Rec Field – Artificial Turf Field – Zero water used for irrigation
USU Rec Field Surrounding Landscape USU Rec Field Surrounding Landscape – All new landscaping is drought tolerant and drip irrigation
Matador Drive Landscape Matador Drive Landscape – All new landscaping is drought tolerant and drip irrigation
Student Housing Replaced 670 apartment kitchen and 770 bathroom 2.5 GPM aerators with 1.0 GPM aerators
Student Housing Replaced 650 2.5 GPM apartment showerheads with 2.0 GPM showerheads
Student Housing Replaced 796 toilets, varying from 1.5 - 2.5 GPF with 1.2 GPF models
Urinals Urinals – most campus urinals on campus have been replaced with waterless urinals
B1, B2, B4 Parking Lot – Trees Trees have been replaced with drought tolerant trees that require no irrigation
Public Awareness Signage Public Awareness Signage Campaign for every sink in every restroom
Auditing irrigation controllers Auditing irrigation controllers
Dual flush toilets are currently being tested Dual flush toilets are currently being tested
Replacing remaining traditional urinals Replacing remaining traditional urinals with ultra-low flush units
Arbor Court Landscape Replacement 22,000 gallons a year savings
Orange Grove Replace 600 irrigation heads from 1 - 3.0 GPM to 0.25 GPM
North-East & South-West Corner Redwood Hall Landscape replacement with drought tolerant plantings
G3 Parking Lot North Side Landscape replaced with drought tolerant planting