Raising the roof trusses


On the morning of the second day the roof trusses started going up. All the trusses were prefabricated, but still required a large crew to get them to the top of the wall and set up in place. Eric is pushing on the left and Arpad is pulling from inside the attic. Cecil (orange shirt), Andy (inside the house), and someone at the other end apply the necessary muscle to raise the truss into position. Norman and an unknown Crew Leader from another house are observers.

Return to the working on house 936 index page.